If you are purchasing a Berkeley Group new-build property, arranging an independent snagging inspection can provide reassurance before or shortly after completion.

New Build Snagging Specialists carry out professional snagging inspections across London and the South East, identifying workmanship issues, incomplete finishes and visible defects in line with recognised industry guidance.

Understanding Large-Scale Urban Developments

Berkeley Group is known for delivering large-scale urban regeneration projects and high-specification apartment schemes across London and surrounding counties.

These developments often involve multi-storey buildings, phased handovers, basement parking structures and complex mechanical and ventilation systems.

On projects of this scale, build pace, multiple contractor teams and phased completions can naturally lead to minor finishing inconsistencies at handover. Independent snagging ensures that cosmetic and technical items are identified clearly and documented professionally before or shortly after completion.

Common Issues Identified in New-Build Apartments

Minor finishing items such as flooring alignment and expansion gaps are frequently queried by buyers. You can read more about acceptable tolerances in our detailed guide on 1mm flooring gaps in new-build homes.

Across the UK new-build sector, buyers of modern apartment developments frequently encounter items such as:

  • Cosmetic paint finish inconsistencies under natural light
  • Silicone application inconsistencies in kitchens and bathrooms
  • Minor flooring expansion gaps
  • Balcony drainage alignment concerns
  • Window and door adjustment requirements
  • Extractor fan performance issues
  • Sealant completion around sanitary ware
  • Brickwork or façade presentation defects

These items are typically minor but should be recorded and rectified in line with industry standards and warranty provider guidance.

External level detailing, including air brick positioning relative to finished patio levels, is another area buyers frequently seek clarification on. You can read our detailed guidance on air bricks installed at patio level here.

Our reporting references recognised tolerance standards where applicable, ensuring that items are assessed objectively and in accordance with industry expectations rather than subjective opinion.

Each inspection includes:

 

 

  • A comprehensive internal and external assessment
  • Detailed photographic evidence
  • Clear written explanations
  • Reference to relevant tolerance standards where applicable
  • Thermal imaging where required
  • Drone roof inspection (where access allows)
  • Reports are delivered promptly and formatted for clear submission to site management teams.

Why Choose New Build Snagging Specialists for Your Berkeley Property

At New Build Snagging Specialists, we provide independent, buyer-focused inspections designed to protect purchasers of newly built homes and apartments.

Our inspectors operate in accordance with recognised industry standards and produce detailed photographic reports suitable for submission to site management teams.

We are entirely independent and act solely in the interest of the buyer.

Our inspections are conducted in line with recognised industry guidance and focus on identifying visible defects, workmanship issues and incomplete finishes.

  •  

Reports are delivered promptly and formatted for clear submission to site management teams.

We regularly carry out snagging inspections across London, Essex, Hertfordshire, Surrey, Kent, Berkshire and Buckinghamshire. If you are purchasing within one of these counties, you can explore our dedicated area pages for more localised information.

Whether purchasing an apartment in a high-rise development or a townhouse within a regeneration scheme, independent snagging provides clarity before finalising your move.

FAQ

Do you work directly for Berkeley Group?

No. We act independently on behalf of the buyer to provide an objective inspection report.

Can I arrange a snagging inspection before completion?

Pre-completion inspections are subject to developer access arrangements, but many buyers arrange inspections either prior to legal completion or shortly after handover.

Is snagging necessary on a new apartment?

All newly constructed properties may present minor finishing items at handover. Independent inspection provides clarity and documented evidence for rectification.